NATURAL DISASTER EMERGENCY RESPONSE

2016

ROLLING SLOWDOWN

2013

Area Wide Protective’s team designed the traffic control plans for the rolling slowdown based on a study developed by our own Compliance & Engineering team to determine how traffic would be affected. AWP’s Field Management, in the area local to where the traffic control project would take place, worked with our Engineers and Estimators at the corporate office to coordinate efforts between all parties involved, including the local Police Department, INDOT, and AEP. Our AWP team provided and installed necessary communications, traffic control equipment, and traffic signage. We also provided and operated the chase vehicles.

The rolling slowdown covered nearly ten miles of interstate. All went safely and smoothly with minimal disruption to the usual flow of traffic on and around I-69.

TRANSMISSION LINE CROSSING: A GROUND & AIR COLLABORATION

JANUARY 23, 2015